Widseth worked closely with Central Power to create a new stretch of powerlines on the western and northern edges of Minot in 2019. The goal was to create a more dependable power source. As a result of the project, Verendrye Electric Cooperative now distributes more reliable power through its distribution substations in the Minot area. This means the Minot Air Force Base, businesses, and residents experience less blink outages and fewer long-term outages. To learn more about the project, watch the video we produced with Central Power's Chief Transmission Engineer Ryan Callahan and Real Estate Administrator Eric Popinga.

 

 

 

Do You Need Transmission Line Design & Engineering Services?

Our transmission engineers will work with you to develop cost effective new routes or reroutes to existing alignments. We create comprehensive PLS-CADD Models and plans & specifications for construction to help your project run smoothly.

  • New line layout and mapping
  • Bid document management and organization
  • Accurate, up-to-date structure drawings
  • Construction survey and staking
  • Detailed material lists and acquisition
  • Detailed construction phasing diagrams
  • Comprehensive loading and drawing diagrams for laminate and steel poles
  • Specific stringing tables based on time of the year for construction crews